Project Description
Audrey Construction was entrusted by Comilog / Sertrag with the handling and transportation of two heavy-duty crates containing wagon wheels. This operation required meticulous planning, coordination, and execution to ensure the safe and efficient movement of these critical components.
Scope of Work:
- Reception and Verification: Upon receipt, the crates were inspected for integrity, labeling, and documentation accuracy.
- Manutention: Specialized lifting equipment and skilled personnel were deployed to safely maneuver the crates, each containing high-density wagon wheels.
- Transportation: The crates were securely loaded and transported using appropriate vehicles, ensuring compliance with safety and logistical requirements.
- Delivery: The cargo was delivered on schedule to the designated site, with all safety and operational protocols strictly adhered to.



Challenges Overcome:
- Coordination of transport logistics for oversized and weight-intensive cargo
- Ensuring secure handling to prevent damage during lifting and transit
- Compliance with safety standards and client-specific protocols
Outcome:
The project was completed successfully, with the crates delivered in perfect condition and within the agreed timeframe. Audrey Construction once again demonstrated its reliability and technical expertise in handling industrial logistics for mining and infrastructure clients.