Project Description
Audrey Construction was commissioned to execute reinforced concrete works as part of infrastructure upgrades at Libreville International Airport (ADL). The project aimed to enhance the structural integrity and operational capacity of the airport’s tarmac, supporting increased air traffic and improved ground handling operations.
Scope of Work:
- Excavation and ground preparation
- Formwork, reinforcement placement, and high-strength concrete pouring
- Formwork, reinforcement placement, and high-strength concrete pouring
- Joint sealing and surface finishing to meet international aviation standards
- Coordination with airport operations to ensure minimal disruption



Project Highlights:
- Delivered within strict safety and quality control parameters
- Work conducted in an active airport environment under rigorous logistical constraints
- Compliance with ICAO and local civil engineering standards
- Contribution to the modernization and resilience of Gabon’s key aviation hub
Outcome:
This project underscores Audrey Construction’s expertise in high-spec civil engineering works and its capacity to deliver complex projects in critical infrastructure settings.